Free tool
SaaS runway calculator
Enter your numbers to see when you break even, how low your cash gets, and the MRR your growth levels off at. It starts with example numbers; change any field and everything updates.
Default alive on these numbers: you break even in month 14 with cash to spare (lowest point $212,706 in month 13).
MRR ceiling
$80,000
where losses = new MRR
Break-even MRR
$36,364
costs ÷ gross margin
Break-even month
month 14
first month net cash ≥ 0
Simple runway
22.2 mo
cash ÷ this month’s burn
MRR, month by month
Cash at the end of each month
A simplified model: revenue each month is that month’s starting MRR, all costs other than gross margin are fixed, and nothing is paid annually. A full model adds a hiring plan, annual plans and scenarios.
Why MRR levels off
Churn is a percentage, so it grows as you grow, while new MRR doesn't. Growth stops where the MRR you lose each month equals the MRR you add: new MRR ÷ your net monthly loss rate.
Default alive or dead
Paul Graham's question: if nothing changes, do you reach profitability before the cash runs out? If the answer is no, you need to change something now, while you still have time.
Simple vs modelled runway
Cash ÷ this month's burn assumes burn never changes. If revenue is growing, burn shrinks, so the month-by-month result is the better guide, as long as the growth assumptions hold.
Build the full model behind these numbers
The Build a SaaS Financial Model course adds a hiring plan, annual plans, cash timing and scenarios, with one worked example. The first lessons are free.